JMV LPS Limited JMV LPS Limited
 
 
certificate
 

Application of Super Earthing Kit

 
Super Earthing Kit

Installation Method

  • Augur/Drill/Bore a hole of …..mm approx and keep the depth according to the length of the electrode.
  • Drench the hole with some water.
  • Remove the outer packaging.
  • Place the earth rod into the hole and buried it in the pit upto the connector.
  • Now Pour a few bucket of water around the connector.
  • Connect it with the conductor.

Enquire Now Side