JMV LPS Limited JMV LPS Limited
 
 
certificate
 

Application of Earth Rod Seal

 
Earth Rod Seal

1.      Markthe hole template

2.      Membraneseal installation

3.      Pushthe seal tube through the membrane seal

4.      Dampproof membrane watertight

5.      Sealtube watertight

6.      Positionthe earth rod seal housing

7.      Securethe earth inspection pit

8.      Connectconductor tube

9.      Drivethe earth rod

10.   Dropthe bottom compression ring into place

11.   Screwthe top compression ring over the top

12.   Fitthe seal cap. Seals ensure watertight

13.   Connectthe conductors to the rod

14.   Closethe inspection pit cover

15.  Installation is ready forconcreting

Enquire Now Side